DSA Closeouts


 DSA Project Number and Year Project Description
Status
52586
1989
Construction of 3 CR Buildings (relocatable) 
(1 each at Summit, Meiners Oaks and Topa Topa)
6-8-17
Received signed 311 and 168 forms.
52587
1989
Construction of CR Building at Mira Monte. 5-19-17
Cannot locate CO. will meet with DSA LA.
56950
1991
Alteration to CR Building at Nordhoff. 5-31-17
Received signed 108 form from District.
69137
1997
Alterations to Library and CR Buildings at Nordhoff. 5-19-17
Cannot locate CO. Will meet with DSA LA.
100842
1998
Construction of 3 - 24'x40' and 6 - 36'x30' relocatable buildings at Nordhoff. 5-22-17
Received check. Waiting for PCIP to be completed.
 103664
2000-2001
Construction of 4 CR buildings and lunch shelter. Alterations to 2 CR buildings.  5-19-17
Ron to Jeff "The wall behind the modulars is 180' total".
 103668
2003
Construction of Admin Building, Music Building, Library Building, 2 Science Buildings, Covered Walks, and Enclosures.  4-28-17
Received link to plans.
 107638
2005
Alteration to M.P/Kit Building, Admin Building, CR Building and 3 R.R. Buildings.  Incomplete
 107639
2005
Alteration to 3 CR Buildings and Admin Building at Topa Topa.  5-19-17
Ron to Jeff "the steel stud framing in the kindergarten restroom has 3 kickers for bracing to the structure". 
107896
2005 
 Alteration to CR Building A, Cafeteria Building B, and Home Econ Building G.  5-19-17
Ron to Jeff "The gate opening measures 21' 10" plenty wide with no trees in the way.
 107897
2005
 Alteration to CR Building D, Lib/CR Building E.
4-25-17
Received plans from DSA.
 108278
2004-2005
Construction of Football Scoreboard. 4-17-17
Requested proposal from Jeff Bissiri for PCIP.